Server maintenance in progress. Please bear with us

Economic Load Dispatch on a 132 kV Line with Service Potential Transformer Substations: A Case Study of Juja-Rabai Line

dc.contributor.authorKitheka, Joel
dc.contributor.authorMoses, Peter
dc.contributor.authorNyete, Abraham
dc.contributor.authorAbungu, Nicodemus
dc.date.accessioned2026-05-13T09:09:20Z
dc.date.available2026-05-13T09:09:20Z
dc.date.issued2024-09
dc.description.abstractPower outages have created significant challenges for power system networks, particularly in developing countries where the electricity demand continues to rise without a corresponding increase in power generation or the expansion of transmission and distribution networks. In Kenya, while there is a well-established transmission line network, the distribution infrastructure remains inadequate for supplying electricity to end consumers. This paper examines the economic load dispatch (ELD) of power system networks utilizing Service Potential Transformer (SPT) substations to provide electricity to villages located near high voltage (HV) lines. The ELD analysis was conducted to identify the optimal economic power output from the Kipevu, Rabai, and Thika thermal power plants, addressing the demand for both conventional and non-conventional substations. A gradient method was employed to calculate the ELD for these three generating units, and the results were validated using the PowerWorld simulator. Findings indicated that the three generators supplied 20 MW, 37.5 MW, and 12.5 MW, respectively. The results obtained from the gradient method are consistent with those obtained from PowerWorld software. Additionally, this study projected an annual fuel cost savings of USD 17,695.20 when ELD was implemented, compared to a scenario of equal load distribution among generating units. Over a ten-year period, these savings would be sufficient to establish a conventional distribution substation to meet the power demands of villages located further away from high voltage lines.en_US
dc.identifier.urihttp://ir.mksu.ac.ke/handle/123456780/21182
dc.language.isoen_USen_US
dc.publisherJournal of Power, Energy, and Controlen_US
dc.subjecteconomic load dispatch, transmission line, optimum load flow, conventional substation, service potential transformer, Kenyaen_US
dc.titleEconomic Load Dispatch on a 132 kV Line with Service Potential Transformer Substations: A Case Study of Juja-Rabai Lineen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
26-final.pdf
Size:
639.75 KB
Format:
Adobe Portable Document Format
Description:
Full Text

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: