• Login
    View Item 
    •   MKSU Digital Repository Home
    • Research and Publications
    • School of Engineering and Technology
    • School of Engineering and Technology
    • School of Engineering and Technology
    • View Item
    •   MKSU Digital Repository Home
    • Research and Publications
    • School of Engineering and Technology
    • School of Engineering and Technology
    • School of Engineering and Technology
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Economic Load Dispatch on a 132 kV Line with Service Potential Transformer Substations: A Case Study of Juja-Rabai Line

    Thumbnail
    View/Open
    Full Text (639.7Kb)
    Date
    2024-09
    Author
    Kitheka, Joel
    Moses, Peter
    Nyete, Abraham
    Abungu, Nicodemus
    Metadata
    Show full item record
    Abstract
    Power outages have created significant challenges for power system networks, particularly in developing countries where the electricity demand continues to rise without a corresponding increase in power generation or the expansion of transmission and distribution networks. In Kenya, while there is a well-established transmission line network, the distribution infrastructure remains inadequate for supplying electricity to end consumers. This paper examines the economic load dispatch (ELD) of power system networks utilizing Service Potential Transformer (SPT) substations to provide electricity to villages located near high voltage (HV) lines. The ELD analysis was conducted to identify the optimal economic power output from the Kipevu, Rabai, and Thika thermal power plants, addressing the demand for both conventional and non-conventional substations. A gradient method was employed to calculate the ELD for these three generating units, and the results were validated using the PowerWorld simulator. Findings indicated that the three generators supplied 20 MW, 37.5 MW, and 12.5 MW, respectively. The results obtained from the gradient method are consistent with those obtained from PowerWorld software. Additionally, this study projected an annual fuel cost savings of USD 17,695.20 when ELD was implemented, compared to a scenario of equal load distribution among generating units. Over a ten-year period, these savings would be sufficient to establish a conventional distribution substation to meet the power demands of villages located further away from high voltage lines.
    URI
    http://ir.mksu.ac.ke/handle/123456780/21182
    Collections
    • School of Engineering and Technology [118]

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of Digital RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsBy Submit DateThis CollectionBy Issue DateAuthorsTitlesSubjectsBy Submit Date

    My Account

    LoginRegister

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV